Early proposals
The idea of a bridge across the Avon Gorge dates to 1753, when William Vick, a Bristol wine merchant and alderman, left £1,000 in his will to be invested until it had accumulated to £10,000, when it was to be used to build a stone bridge between Clifton and Leigh Woods. By 1829 the fund had grown to about £8,000, insufficient for a stone bridge, and a further Act of Parliament was obtained allowing a suspension bridge to be built instead.
A committee was formed to advance the project, and in 1829 it announced an open competition for the design of a bridge. Twenty-two designs were submitted, including one by Thomas Telford, then the most eminent civil engineer in Britain, who proposed a suspension bridge with very tall towers. Telford was appointed to judge the competition, and rejected all the entries, declaring that no design met the brief. He then submitted his own revised proposal, with towers rising from the floor of the gorge. The committee initially accepted Telford's scheme, but its estimated cost of £52,000 was widely criticised as excessive, and the committee was persuaded to hold a second competition in 1830.
Brunel's design and first construction phase
The second competition was won by Isambard Kingdom Brunel, then a young engineer of 24, who submitted a design for a suspension bridge with Egyptian-style towers. His first scheme was for a bridge with a single span of about 630 feet (192 m), but after discussion with the committee he revised it to a span of about 702 feet (214 m), when the towers were moved back from the edge of the gorge. The foundations were to be on the Old Red Sandstone of the gorge sides, and the towers were to be built of Pennant stone with Bath stone dressings. The chains would be of wrought iron, made from bar links, and the deck of timber.
An Act of Parliament for the bridge received royal assent in May 1830. Construction began on 27 August 1831, with a ceremony in which the first stone of the Leigh Woods abutment was laid, but work was halted almost immediately by the Bristol riots of October 1831, when a mob attacked the site and damaged the contractors' machinery. The riots also badly affected the commercial confidence of Bristol, and subscriptions for the bridge dried up. Work resumed in 1836, after further funds had been raised, and by 1840 the two piers were substantially complete. However, in 1843 the money ran out entirely, with the towers only partly finished and no chains or deck in place. The project was abandoned, and the unfinished towers stood as a landmark for the next two decades.
Completion as a memorial
Brunel died on 15 September 1859, and the Institution of Civil Engineers, of which he had been president, resolved to complete the bridge as a memorial to him. A new company, the Clifton Suspension Bridge Company, was formed, with William Henry Barlow and John Hawkshaw as the engineers, and a new Act of Parliament was obtained in 1861. To reduce costs, the design was modified from Brunel's original: the deck was made wider and stiffer, and the towers were finished to a simplified design, omitting Brunel's intended sphinx sculptures and elaborate cornices.
A key economy was the reuse of chains from Brunel's Hungerford suspension footbridge in London, built in 1845 and demolished in 1860 to make way for the new Charing Cross railway station. The Hungerford chains, which were still in good condition, were purchased for the Clifton bridge, and were supplemented by new links made to match. The chains were tested and found to be of adequate strength. The bridge was completed in 1864 at a total cost of about £57,000, and opened on 8 December 1864 with a grand procession and celebration. The first vehicle to cross was a carriage carrying members of the committee and engineers.
Later history
In 1885, a weight limit of 4 tons was introduced for vehicles using the bridge, and later reduced to 3 tons. The timber deck, which had deteriorated, was replaced in 1897 with a deck of pitch pine on steel cross-girders.
In the 20th century the bridge was strengthened several times. In 1939 a more substantial steel deck was installed, and the chains were reinforced. A major strengthening and refurbishment programme was carried out in 1994–1995, with new steelwork and corrosion protection for the chains. In 2010–2011 the bridge underwent a £1.2 million project to install new lighting, using low-energy LED fittings, which illuminates the bridge at night and can be changed in colour for special events.
The bridge was designated a Grade I listed building on 8 January 1959. In 2003, a set of commemorative postage stamps was issued by the Royal Mail featuring the bridge. The Clifton Suspension Bridge Trust, a charitable body established in 1952, is responsible for the maintenance and operation of the bridge. In 2014, the 150th anniversary of the opening was celebrated with a series of events, including a fireworks display and a re-enactment of the opening procession.